MIL-DTL-11134G
4.4 Conformance inspection. The contractor shall perform the inspection specified in 4.3, 4.4.1 through 4.4.4.
This does not relieve the contractor of his responsibility for performing any additional inspection, which is necessary
to control the quality of the product and to assure compliance with all specification requirements.
4.4.1 Group A inspection. Units presented for acceptance shall be inspected for conformance with the criteria
specified in table I. Lots shall be formed and subjected to the sampling plan as indicated.
4.4.1.1 Order of inspection with group A. Group A inspection shall be performed in an order satisfactory to the
government, except that the operational inspection shall be last.
TABLE I. Group A inspection.
Inspection
Requirement
Inspection
Sampling plan
Paragraph
Paragraph
Table
Visual & Mechanical
IV
(Major)
Visual & Mechanical
(Minor)
V
Electrical
Insulation Resistance
IV
Operation
IV
Microphone
Response
IV
Impedance
IV
Earphone
Response
IV
Impedance
IV
4.4.2 Group B inspection. Group B inspection shall be performed on inspection lots that have passed group A
inspection and on samples selected from units that have been subjected to and met the group A inspection. This
inspection shall conform to requirements in table II.
4.4.2.1 Group B sampling plans. The group B sampling plans shall be as specified in table II.
4.4.2.2 Order of inspection within group B. Group B inspection shall be performed in an order satisfactory to the
government.
TABLE II. Group B inspection.
Inspection
Requirement
Inspection
Sampling plan
Paragraph
Paragraph
Table
Make-break sequence
V
Interchangeability
VI
Microphone
Unagitated circuit
V
Earphone
Overload
V
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business